Enter the production target, the brine grade and where the project is. The estimator returns the operating cost structure per tonne of LCE and a range for the total, for evaporation ponds, DLE or both side by side.
Get a first operating cost estimate per tonne of LCE for a brine project, with its cost structure, a range for the total and a ponds versus DLE comparison.
See plans