Home/Tools/OPEX Estimator
PREMIUM

OPEX Estimator

Enter the production target, the brine grade and where the project is. The estimator returns the operating cost structure per tonne of LCE and a range for the total, for evaporation ponds, DLE or both side by side.

Production (ktpa LCE)Lithium carbonate equivalent per year
Region
South America
Estimates assume a South American salar project
Distance to port
Product transport to the export port
Well yield (L/s)Average pumping rate per production well. Default 20 L/s
Brine grade
Lithium, Li (mg/L)
Calcium, Ca (mg/L)
Magnesium, Mg (mg/L)
Sulfate, SO₄ (mg/L)
mg/L and wt% are converted with a standard brine density of 1.20 g/mL. Sulfate sets whether the evaporation ponds lime the whole brine.
Process route
Compare both calculates the two routes and adds a note on which one fits better and why. It uses 2 analyses, one per route.
Available on the Premium plan

Get a first operating cost estimate per tonne of LCE for a brine project, with its cost structure, a range for the total and a ponds versus DLE comparison.

See plans
← Back to all tools
SubscribeSign in