Enter the production target and the brine chemistry. The estimator recommends a process route, builds its stages, sizes the main equipment and returns a Class 5 capital cost with its structure, plus the operating cost for the same inputs. Site and process options start from typical values and can be changed under Advanced configuration.
Get a Class 5 capital cost estimate for a brine project: the recommended process route, its stages, the cost structure, its position on the industry cost curve and the operating cost for the same inputs.
See plans